Monday, April 5, 2010

Kitchen Remodel Part 2: Things never go as planned!

So the work marches on! We wanted to grout the tiles last weekend but we had a friend who used to do tile work professionally strongly suggest we add a product called Anti-Hydro to our grout. But we couldn't find it. When we finally did, the store had to order it from the warehouse in Salt Lake so we won't get it until Wednesday. Since the floor won't be done until next weekend Mac plugged in my new stove so I would at least have a cooking surface. Here is my new stove! We are trying to do the kitchen economically and this one was not a flat top but it has all digital oven controls, self-cleaning, and it was on sale! The first thing I baked in it was a pretzel crust for my Easter dessert. The first thing I cooked on the stove-top was eggs and hash-browns for Easter breakfast! It works awesome and heats up so fast. I burnt the bottom of the hash-browns because I am used to cooking on my 25 year old stove and I needed to turn the heat way down!



Because we couldn't work on the tiles, Mac pulled the old sheet rock down, filled all the holes that let in terrible drafts and then put new sheet rock up. That all went pretty smoothly and needed to be done anyway. Then he started to tape and mud the wall and noticed that some of the old texture was flaking off. He got his scraper and tried to get all the lose stuff off. However, the lose stuff kept going and going and going. Eventually the entire wall was scraped down and the sheet rock above the window was completely rotten so that had to be pulled out and replaced. Now he has the entire wall to mud, sand, and re-texture. Next step: pick a paint color!


No comments:

Post a Comment